Home About Manufacturing
Infrastructure · Production

Where precision
is manufactured.

Two state-of-the-art facilities — engineered for the full cycle from R&D to final assembly, test, and delivery. Built to scale as our portfolio grows.

0Active Facilities
0k+Sq ft Total Area
0%Made in India
0+ISO & MSME Certifications

Designed to build. Built to scale.

Every Pinnac facility is engineered as a vertically integrated production environment — from raw material handling through precision machining, electronics assembly, software integration, and system-level testing under a single roof.

This integration is not incidental. It is how we maintain the tolerances, lead times, and quality standards that defence procurement demands.

ISO 9001:2015 ISO 14001:2015 MSME Registered Make in India DPIIT Recognised

Precision CNC Machining

5-axis CNC machining cells for airframe components, actuator housings, and structural brackets. Sub-0.1mm tolerances maintained across production batches.

Electronics & Avionics Assembly

Cleanroom PCB assembly, SMT soldering, and avionics integration bays. Full IPC-A-610 Class 3 process controls.

System Integration & Test

Dedicated SIT bays with anechoic chambers, EMI shielded rooms, and thermal-cycling environmental test chambers.

R&D & Prototyping Cells

Rapid prototyping capacity with FDM/SLA 3D printing, composite layup, and dedicated firmware development labs with HIL test benches.

Facility 01 — Primary Manufacturing
01
Operational
Vasind, Maharashtra
Thane District · Mumbai Region
Facility 01 Primary Production & R&D

Vasind Manufacturing Complex

Thane District, Maharashtra · Est. 2018

Our flagship manufacturing and research facility. Spanning over 80,000 sq ft, this is where every core Pinnac technology is born — from first-principles actuator design through prototype, production validation, and final system integration.

80k Sq Ft Area
200+ Personnel
3 Production Lines
Actuator Manufacturing Servo Motor Winding Avionics Assembly Airframe Fabrication R&D Labs SIT Bay
Patent development centre — all patented actuator and navigation technology designed, tested, and refined here
ISO 9001:2015 certified production processes with full traceability from raw material to shipped system
In-house anechoic chamber for RF, EMI, and datalink validation of all wireless systems pre-delivery
Facility 02 — Assembly & Test
02
Operational
Thane West, Maharashtra
Wagle Estate MIDC · Mumbai Region
Facility 02 Final Assembly & Delivery

Thane West Operations Centre

Wagle Estate MIDC, Thane West · Est. 2021

Our corporate operations and final delivery facility. This centre handles final system assembly, customer acceptance testing, simulator commissioning, and logistics for all delivered platforms and training systems.

40k Sq Ft Area
80+ Personnel
2 Assembly Bays
Final System Assembly Customer Acceptance Test Simulator Commissioning Logistics & Dispatch Field Service Hub
Customer acceptance facility — clients may attend and witness final system qualification testing prior to dispatch
Simulator commissioning bay — dedicated area for full motion platform commissioning, software integration, and driver training before site delivery
National dispatch hub — serves as the logistics centre for nationwide spare parts, field service deployments, and AMC management

Expanding infrastructure.
Growing capability.

Updated as new facilities are confirmed
03
Planned

North India Production Hub

Ludhiana, Punjab · PSIEC Industrial Area

Dedicated facility for airframe fabrication, composite manufacturing, and drone platform final assembly to serve northern and border-area customers.

Composite layup Airframe fab ~60,000 sq ft
04
Announced

Electronic Warfare & Systems Lab

Hyderabad, Telangana · Location TBC

Specialised facility for EW system development, SIGINT payloads, and high-assurance software engineering in a secure, access-controlled environment.

EW development Secure lab ~40,000 sq ft
05
Facility 05
Location and capability under evaluation.
Announcement expected 2026.
06
Facility 06
Reserved for future expansion.
Details to follow.
07
Facility 07
Reserved for future expansion.
Details to follow.

From concept to cleared system.

A disciplined manufacturing process that ensures every platform leaving our facilities meets the same standard — regardless of volume.

01

Design & Engineering Release

All designs are released through a formal engineering change control process. No production part is manufactured without a released drawing, BOM, and material specification.

02

Material Qualification

All incoming raw materials and sub-assemblies are inspected and logged against certificate of conformance. Non-conforming material is quarantined and rejected before entering the production line.

03

Precision Manufacture & Assembly

Machining, composite layup, electronics assembly, and mechanical integration executed to ISO 9001 work instructions. Each stage has defined inspection hold points.

04

System Integration Testing

All assembled systems undergo hardware-in-the-loop (HIL) testing, environmental stress screening (ESS), and functional verification before progressing to acceptance.

05

Customer Acceptance & Delivery

Customer witnesses final acceptance testing against agreed ATP. Full documentation package — as-built records, test reports, calibration certs — delivered with each system.